Post Nord
In 2017 Epcido was awarded contract to install 630 meter new fully automated post and parcel system in Örebro Sweden. Scope included logistic planning, offloading materials and equipment.
The installation included both mechanical and electrical installation of steel structure, sorters, conveyors, boom conveyors, spiral chutes, switch and control boards, ASI-BUS, LAN and finally test and commissioning.